Solar hot water Plonk On services builders trade

Envirosun AS Split System Solar Hot Water Systems

Plonk on hot water system scope of works

Envirosun Installer does↓

  • Install, connect and secure Envirosun solar collector panels to the roof of the premises, in a confirmed location as per Envirosun specifications
  • Connect and secure the Envirosun solar panel sensor to the hot outlet of solar collector. Leave sensor lead bundled and taped on roof
  • Blow off / Clean roof area
  • Remove all rubbish from site

Required to be completed by others↓

  • Run all copper flow and return lines from the Envirosun solar panels on the roof to the storage tank location
  • All penetrations to roof
  • Run sensor cable (previously connected to solar panels) to the storage tank location with the flow pipe
  • Final fit out of storage tank
    • Connect solar pump to storage tank
    • Connect sensor to pumping module
    • All plumbing and electrical as per Envirosun specifications and regulations

 NOTE/- Your plumbing contractor will have to get on the roof for this installation, under no circumstances is the solar hot water panels to be pressurised during plumbing roughin test

Envirosun logo

Click Here to go back to our Home page

https://enviroheathotwater.com.au

Enviroheat hot water heaters